SKIP LINKS: Homepage | About Us | Our Services | Recent Projects | Client List | Useful Links Contact Us Sitemap |

Civil engineers and paving specialists

TRANSPORT infrastructure

Project:

Mersey Square, Stockport

Mersey Square
» enlarge image
Client: Stockport Council
Value: £200,000
Scope:

The company refurbished an existing bus platform is central Stockport.  The project included reconstructing section of concrete carriageway to accommodate multi bus loadings and the re-paving of the platform in granite flags and steps.  The platform also benefited from a bespoke glass and metal shelter.


Project: Shelter Erection Programme on Various Merseytravel Bus Routes Bus Shelter
» enlarge image
Client: Signature
Value: £2½ million
Scope: Construction of mass concrete foundations and erection of new bus shelters. Upgrading of existing footway pavement to form new raised bus stop 'footprints'. Five year rolling programme.

Project: Eanam Bus Lane Eanam Bus Lane
» enlarge image
Client: Blackburn and Darwen Borough Council
Value: £230,000
Scope: Carriageway widening in order to create a new bus lane and the introduction of new traffic signals, linked via fibre optic cable to existing signals creating a bus priority corridor into the city centre. The project also required extensive cabel and pipe service diversions.

Project: Winstanley College Bus Loop Winstanley College Bus Loop
» enlarge image
Client: Winstanley College
Value: £225,000
Scope: Construction of a bus loop, creating stopping facilities for eleven busses. Bespoke quayside fencing creating controlled queuing, lighting, street furniture and soft landscaping works.

Project: Altrincham, Bolton, Leigh and Wigan Bus Interchanges Altrincham, Bolton, Leigh and Wigan Bus Interchanges
» enlarge image
Client: GMPTE
Value: £240,000 (combined)
Scope: Reconstruction of existing bus station pavements to form new reinforced concrete hard standings. Additional works to construction joints, kerbing, pedestrian crossings and miscellaneous repairs.

Project: Various Quality Bus Corridor Improvement Works. bus
» enlarge image
Client: GMPTE, Merseytravel and Various Local Authorities
Value: £10 million (since 1998)
Scope: Reconstruction of existing footways and lay-byes to form new DDA compliant raised kerb bus "footprints". Associated works include electrical infrastructure for real time information systems, carriageway markings and surface treatments.


Website design by Studio North

© George Cox and Sons Ltd 2007. All rights reserved.

George Cox and Sons Ltd
Hall Lane, Farnworth, Bolton BL4 7QF
Tel: 01204 000 0000
Fax: 01204 000 0000
E-mail: info@gcox.co.uk