SKIP LINKS: Homepage | About Us | Our Services | Recent Projects | Client List | Useful Links Contact Us Sitemap |

Civil engineers and paving specialists

structures

Project: Liverpool South Parkway Rail / Bus Interchange Enabling Works. Liverpool South Parkway
» enlarge image
Client: Merseytravel
Value: £900,000
Scope: Enabling works including site clearance, groundwork, and the construction of the new access road, pavements and drainage systems. The drainage systems were 6 metres deep and included the introduction segmental ring manholes.

Project: Bass Lane Retaining Wall Bass Lane Retaining Wall
» enlarge image
Client: Bury MBC
Value: £375,000
Scope: The project involved the reconstruction of an existing retaining wall on a very narrow road in Bury. The profile of the land beyond the wall was a very steep incline and, in order to overcoming access and safety issues, extensive temporary works were installed to provide earth support and safe working space during the construction period.

Project: Bramhall Footbridge Bramhall Footbridge
» enlarge image
Client: Stockport Council
Value: £55,000
Scope: The dismantling of the existing footbridge followed by the reconstruction on new concrete foundations. The bridge spanned a water course and was located in the centre of Bramhall Park which created logistical challenges both to gain access for the construction works, and to provide protection to the watercourse.

Project: Calderbrook Landslip Stabilisation Calderbrook Landslip Stabilisation
» enlarge image
Client: Rochdale MBC
Value: £275,000
Scope: This steep embankment in the Calderbrook area was suffering from landslip, threatening the integrity of a number of surrounding carriageways. The land was excavated to sound, stable substrata and rebuilt in compacted stone which was constructed in a stepped sequence. Further support was provided by a series of gabion baskets. Due to the incline of the land, the company utilised remotely controlled compaction rollers in order to eliminate fall risk hazards. Additional works within the contract included the reconstruction of damaged sections of carriageway and large drainage culverts in order to divert future water damage to the ground.

Project:

The Braid, Blackburn

The Braid
» enlarge image
Client: Blackburn with Darwen Borough Council
Value: £70,000
Scope:

No high specification city centre paving scheme is complete without a focal point.  For Sudell Cross in Blackburn, the focal point was this 8 metres high metal & lighting sculpture.  The installation of the sculpture required the formation of large foundations and four Chinese granite plinths, set-out using templates of the base, which the structure fitted perfectly onto.  The erection of the feature was undertaken on Sunday to ease traffic congestion and required two cranes working simultaneously to position the structure correctly.


Project: Bramhall Retaining Wall Bramhall Retaining Wall
» enlarge image
Client: Stockport Council
Value: £225,000
Scope: This wall was a long length situated adjacent to a very busy, but single, carriageway used as a main commuter route. The project was constructed in a number of phases, with several sections being completed out of hours. This approach to the project minimise the disruption caused to daily peak hour traffic.


Website design by Studio North

© George Cox and Sons Ltd 2007. All rights reserved.

George Cox and Sons Ltd
Hall Lane, Farnworth, Bolton BL4 7QF
Tel: 01204 000 0000
Fax: 01204 000 0000
E-mail: info@gcox.co.uk