| Project: | M60 Motorway, Junction 1 | ![]() » enlarge image |
| Client: | Stockport Council | |
| Value: | £1 million | |
| Scope: | Construction of an additional bus lane on the approach to a major motorway / city centre roundabout. Reconstruction of large areas of footways and carriageways. Phased construction programme to maintain vehicle traffic flows. |
| Project: | Barton Road / Barton Lane | ![]() » enlarge image |
| Client: | Salford City Council | |
| Value: | £450,000 | |
| Scope: | Junction improvement works to a major controlled crossroads in Eccles. Complete footway reconstruction, traffic signal upgrade, retaining wall construction and carriageway resurfacing. Much of the work was completed at night to minimise disruption daytime traffic flows. |
| Project: | A62 Oldham Road Junction Improvement Works | ![]() » enlarge image |
| Client: | Manchester City Council | |
| Value: | £215,000 | |
| Scope: | Junction improvement works to four separate junctions along the A62 Oldham to Manchester road. Footway and island reconstruction, new duct network and traffic signal works. |
| Project: | A573 Warrington Road, Ince | ![]() » enlarge image |
| Client: | Wigan Council | |
| Value: | £275,000 | |
| Scope: | Introduction of a new roundabout and access road to new retail outlet, situated on a busy junction on Warrington Road near Wigan. Construction of new carriageway, islands and footways together with the reconstruction of existing footways and carriageway resurfacing. |
| Project: | A58 Bolton Road Orbital Bus Corridor | ![]() » enlarge image |
| Client: | Bury Metro Council | |
| Value: | £800,000 | |
| Scope: | Carriageway widening, junction improvements reconstruction of footways and carriageway resurfacing. Street lighting, soft landscaping, traffic signals and associated works. Main truck route between Bolton and Bury, maintained open to vehicles and pedestrians throughout the contract. |
| Project: | College Way | ![]() » enlarge image |
| Client: | Bolton Metropolitan Borough Council | |
| Value: | £80,000 | |
| Scope: | Kerb and footway re-alignment, carriageway and footway resurfacing and the re-construction of a large raised, controlled pedestrian crossing to enable large volumes of studens to pass safely between campuses on either side of the road. |