Value: £333,000

Client: BMI Healthcare

Start Date: May 2016

Finish Date: July 2016  

 

This overflow car park construction scheme was initially procured via a competitive tender. However, when the scheme came over their budget it was in danger of not going ahead.

We were able to provide alternative designs which included the processing of all site won materials to use in place of capping layer.A redesign of levels was made to eliminate all disposals off-site, plus redesign of drainage and attenuation system to provide a more cost effective solution. By an intensive testing regime were able to save construction thicknesses whilst maintaining specification (on the link road and turning areas). These design changes saved the client £125k. That equates to a 27% cost saving from the original specification/design.

Works included: - 

  • Creation of a new access road
  • Surfacing
  • White lining
  • Drainage
  • Construction of attenuation tank
  • New barriers
  • Lighting
  • Signage
  • Landscaping
  • Fencing